At AGM, our responsibility goes beyond project delivery—it extends to the safety of our people, the satisfaction of our clients, and the protection of the environment. Our integrated QHSE Management System is a core pillar of how we operate, ensuring that every phase of our work meets the highest international standards.
Zero incidents is our goal. We empower every employee to take responsibility for a safe working environment and proactively mitigate risks.
We minimize our environmental impact through efficient resource use, pollution prevention, and continuous improvement in sustainability practices.
We follow rigorous QA/QC protocols to meet and exceed client expectations, supported by regular audits and corrective actions.
Risk awareness and control are embedded in our processes from planning to delivery, ensuring consistent performance and accountability.
Our QHSE approach protects people, safeguards the environment, and ensures long-term project success. It also strengthens client trust and supports our role as a responsible industry leader.
At AGM, we don't just deliver engineering—we deliver confidence.
We built this company to raise the standard for what it means to be an oil and gas engineering partner in the region. We come from the field. We understand the stakes. And we know what it takes to move a project from paper to production without compromise.
Here's why clients choose to work with us—and stay with us:
We're not tied to any vendor or manufacturer. Every decision we make is driven by what's best for the project—not what's convenient or easy.
QHSE isn't a checklist for us—it's the framework for everything we do. Our commitment to safe design, efficient delivery, and environmental responsibility is non-negotiable.
Every study we produce, every drawing we issue, every field call we make is geared toward one thing: real-world impact. We don't over-engineer. We don't cut corners. We engineer to build.
We're proud to have supported companies like TotalEnergies, Shell, INA Naftaplin, and Sinopec. These partnerships weren't handed to us—they were earned, project by project.
Our track record of excellence spans decades, with successful project delivery across the oil and gas sector. Below is a selection of our most significant projects.
Project Title | Client | Estimated Value | Scope |
---|---|---|---|
Nabucco Gas Pipeline Project | Nabucco Gas Pipeline International GmbH | $10.2 billion | Detail Design (DD) |
BLACK SEA PESCARUS UNMANNED PLATFORM | S.N.P. PETROM S.A. OMV Group | €30.0 million | Feasibility Study, Basic Design, Procurement Support, Detail Design (FS, BD, PS, DD) |
IDU FLOW STATION | ALCON Nigeria NAOC NIGERIA | $85 million | Procurement Support, Detail Design (PS, DD) |
National Crude Oil Transport System Rehabilitation | PLE ESSEN GmbH CONPET S.A. | $150 million | Basic Design (FEED), Procurement Support, Detail Design |
OBIAFU/OBRIKOM PLANT WORKS & IRRI FLOWSTATION – N-LNG PHASE 3 GAS SUPPLY PROJECT | Saiperm S.p.A. Italia NAOC NIGERIA | $120 million | Procurement Support, Detail Design (PS, DD) |
Petrol Stations Vaslui, Craiova, Galati Buzau, Timisoara, Piatra Neamt | S.N.P. PETROM S.A. OMV Group | $60 million | Basic Design, Procurement Support, Detail Design (BD, PS, DD) |
Dn 500 Natural Gas Transport Pipeline Turcinesti - Motru (95 kM) | Transgaz Medias | $22 million | Basic Design, Procurement Support, Detail Design (BD, PS, DD) |
Dn 300 Tolkan Borankol gas and condensate transportation pipeline (50 Km) | ASCOM Group | $45 million | Feasibility Study, Basic Design, Procurement Support, Detail Design (FS, BD, PS, DD) |
Constanta - Trieste crude oil pipeline (Romanian section) | Parsons - USA | $1.5 billion | Feasibility Study (FS) |
Oil and gas gathering and treatment plant for Tasbulat field | S.N.P. PETROM S.A. OMV Group | $3 million | Feasibility Study, Basic Design, Procurement Support, Detail Design (FS, BD, PS, DD) |
Butimanu Natural Gas Compressor Station and Underground Storage Facilities | EXPROGAZ S.A. – Ploiesti | $4.35 million | Feasibility Study, Basic Design, Detail Design (FS, BD, DD) |
Tolkan – Borankol Kazakhstan's Fields. Gas and Condensate (UKPG) Complex Process Facilities | S.N.P. PETROM S.A. – Petrom International | $32.5 million | Feasibility Study, Basic Design, Detail Design (FS, BD, DD) |
TUBUREA LPG PLANT | S.N.P. PETROM S.A. | $4.5 million | Feasibility Study, Basic Design, Detail Design (FS, BD, DD) |
LPG PLANT AT PORT SUDAN | GENERAL PETROLEUM CORPORATION | $6.8 million | Feasibility Study, Basic Design (FS, BD) |
Irani Gas to Europe Feasibility Study - Land Route Report (On Romanian territory) | PLE ESSEN GmbH | $4.5 billion | Feasibility Study (FS) |
12" SCOTT Pipeline | Sinopec group | $2.5 million | Basic Design and EPC scope of work |
Field Development Plan, Gathering and Transportation System, and pipelines | Sinopec group | $25 million | Basic Design and EPC scope of work |